Construction And Operation

  • Self built reservoir

    Self built reservoir:

    Land occupation:100 hectares
    Capacity:10 million m³
    Scale:The largest water supply capacity among Cambodia's special economic zones

  • Self built water supply plant

    Self built water supply plant:

    Scale:30000 cubic meters per day
    Source of water:Using surface water
    Standard:Chinese drinking water standards
    Quality:Professional water quality treatment

  • Self built sewage treatment plant

    Self built sewage treatment plant:

    Light Industry Zone: 15000 cubic meters per day, under construction, planned to start production in October
    Chemical Industry Zone:Planning and Design in Progress

  • Power supply and steam supply

    Power supply and steam supply:

    Grid power supply:Adopting power supply from the national grid in Phnom Penh, the capital city, to ensure dual power supply, stability and reliability
    Power generation, power supply, and steam supply:Plan to build a self built power plant with guaranteed electricity and steam supply

  • Shipping Terminal:

    Shipping Terminal:

    Sihanouk Port:60KM away from the second phase of the special zone, 10000 ton dock
    OMP Pier:8KM away from the second phase of the special zone, 5000 ton dock

Entering Zhejiang SEZ

More than 100 enterprises have signed contracts to settle in, more than 50 enterprises have started construction, 15 enterprises have been successfully put into operation, and the investment promotion work is being comprehensively promoted.
  • Large scale and diverse business formats
    Large scale and diverse business formats
    Covering an area of 1221 hectares, the business is very diverse and inclusive.
  • Industrial town with complete supporting facilities
    Industrial town with complete supporting facilities
    The SEZ has administrative services,business offices,supermarkets,vegetable markets,catering and entertainment,schools,banks,etc.
  • Superior location and convenient transportation
    Superior location and convenient transportation
    The SEZ is located 148 kilometers away from National Highway 4, 3 kilometers away from the 135km exit of Jingang Expressway, and within easy reach of Xigang and Xigang Airport.
  • Close to the dock, efficient logistics
    Close to the dock, efficient logistics
    8KM away from the 5000 ton OMP dock, greatly reducing the distance to surrounding international deep-water ports.
  • Exclusive license, unique advantages
    Exclusive license, unique advantages
    The only special permission granted by the Cambodian government to enter the park is for the recycling and processing of scrap metal, plastic, paper, and power batteries.
  • Self built reservoir for convenient water use
    Self built reservoir for convenient water use
    Covering an area of 100 hectares, with a storage capacity of over 10 million square meters.
  • Sewage treatment, independent and autonomous
    Sewage treatment, independent and autonomous
    We have built sewage treatment plants in the light industry zone and chemical industry zone respectively, ensuring reliable sewage treatment.
  • Dual power supply, stable and reliable
    Dual power supply, stable and reliable
    Supply power to the national power grid in Phnom Penh, ensuring dual power supply. Plan to build a 400MW biomass power station with guaranteed electricity and steam supply.
  • Flexible rental and sales, according to your needs
    Flexible rental and sales, according to your needs
    Long term land lease of 99 years, and even permanent ownership of property rights. Available for rent or sale, according to your needs.
  • One stop service, worry free operation
    One stop service, worry free operation
    We have a professional team to provide one-stop services for settled enterprises.